o get hands look, depression, memory, power supply on the welded pipe butt a little above (in front of forgot to take pictures. SORRY). No problem, hit the value of the electricity directly. Motherboard to run C1, memory, however, a bit of memory voltage measured only one. A few V, and then control a very normal test. Input is also very normal.
After removing the tube measurement, the tube is good. To determine causes of leakage is because the pad bar. Only the comments. I removed the tube after a pair of virtue.
After removing the tube measurement, the tube is good. To determine causes of leakage is because the pad bar. Only the comments. I removed the tube after a pair of virtue.
I am a bad weld in the front. Not that technical. Because D is 3.3V very directly to the. Therefore, in the back and looked for a place directly connected to 3.3V. Scratch pad, direct welding up.
Then G pole and S pole welded to the two lines. From the inside hole to wear to the board below, solder to the pads.
A good weld, after the electrical test no problem, and carry out mopping up. With insulation tape affixed to play pipe above. Encountered chassis to prevent short circuits.
Re-boot test. OK